  • Step 1: A steel cylinder is fabricated and manufactured.
  • Step 2: A joint ring is attached to the steel cylinder.
  • Step 3: The cylinder assembly undergoes hydrostatic testing.
  • Step 4: The concrete core is embedded (placed) around the cylinder, which is slightly different from what takes place in a lined cylinder pipe. In a lined cylinder pipe, the steel cylinder is lined with concrete, whereas in the embedded cylinder, the cylinder is encased in concrete to form the core. Radial compaction method is used to line a cylinder pipe putting the concrete into place centrifugally.
  • Step 5: The concrete core is cured to give it added strength.
  • Step 6: Prestressing wire size is determined along with the tension and spacing needed to meet design requirements. Finally, the Prestressing wire is wrapped around the concrete core to give it a high tensile strength. In the lined cylinder pipe the wire is wrapped onto the steel cylinder directly whereas in the embedded cylinder the Prestressing wire is wrapped around the concrete core.
  • Step 7: Apply mortar coating.
  • Step 8: Cure mortar coating.